TOGLIT Install procedure

1.Pipe Chamfering 

After cutting the pipe with an appropriate plastic pipe-cutter,
chamfer the pipe bore with a de-burring tool or knife.
Make sure to remove any external burrs.
This prevents damage to the o-ring or dislocation from its groove during installation.

2.Inserting the fitting 

Confirm the Nut loosen at first, then mount the pipe on the toggle parts and push the parts until it passes through the pipe end.
The pipe needs to be mounted from the shorter sleeve direction.

3.Inserting Nipple Body 

Insert the nipple body into the pipe until the nipple side groove locked with the cover edge.

4.Nut tightening By WRENCH or POWER TOOL 

Tighten the Nut until the Bolt and Nut are removed.
The Nut can be tightened by a wrench or a power tool. (Size : M8)
When using a power tool, only use a low number of revolutions.

5.Completion 

After the Nut tightening, the Bolt and Nut will be removed automatically.
It is the completion of the connection.
The plastic cover can be removed after installation.

TOP
MECHFit
Features
Line-Up
Strong Point
Install procedure
CARRIT
Features
Line-Up
Strong Point
Install procedure
TOGLIT
Features
Line-Up
Strong Point
Install procedure
O'zzone Boy B
Features
Line-Up
Strong Point
Install procedure
ABACUS
Features
Line-Up
Strong Point
Install procedure